Landscaping Application.

    New Dunsborough Lakes Address

    Please note, if your builder is co-ordinating, a representative from the company (e.g. Supervisor) will be required to sign off the job once completed and satisfied with the works.

    All correspondence will be emailed to the email address provided above.

    The landowner acknowledges that the terms of this package require landscape works to be completed within 18 months of the settlement date.

    Important Notes:

    As detailed in the Contract of Sale, prior to landscape installation the landowner is required to:

    • Install a 90mm PVC pipe under driveway, 4 metres from the carport/garage. This is required for the installation of irrigation
      pipes and should be clearly pegged/left exposed.

    • Arrange for an external power point to be installed next to the meter box.

    • Arrange with a licensed plumber installation of a plumbing cut-in with a 20mm gate valve with back flow protection adjacent
      to the water meter.

    • Ensure that the site is clean and graded to final levels (generally 30mm below the top of driveway).